Thank you – your subscription is confirmed. You will receive new articles by email.
Articles on ventilation, secretion management and sleep therapy – freely accessible.
Mechanical insufflation-exsufflation (MI-E) is an established technique for cough augmentation in neuromuscular disease. In bulbar dysfunction, however, the upper airway can become the limiting factor. Why more pressure does not always mean more effect.
October 13, 2026 9 min read Expert-reviewed
Between two cough cycles, the BiWaze Cough maintains a positive airway pressure during the pause phase. What this function is based on, how it fits into the therapy cycle and what the technical data actually show.
October 8, 2026 6 min read
Both devices are used with patients who have secretion problems, but they do fundamentally different things: one supports a missing cough, the other loosens and mobilises secretions. Mixing them up means picking the wrong device at the bedside.
September 30, 2026 7 min read
One circuit, two paths: the Dual Lumen Breathing Circuit for BiWaze Cough & BiWaze Clear separates inhaled and exhaled air within a single set. This article explains what that means for everyday use at the device.
September 28, 2026 4 min read
BiWaze Clear carries CE marking and is now available in Europe. It combines lung expansion, secretion mobilisation and aerosol delivery in one closed circuit. A short overview of how it works.
September 21, 2026 2 min read
CoughCue detects the moment the lungs are full on the BiWaze Cough and starts exsufflation exactly then. How the two trigger types work, what the inspiratory hold time does, and how CoughCue differs from the inspiratory trigger.
August 7, 2026 5 min readWe send you new specialist articles as soon as they are published – usually once a week.